Allentown
73° F
Clear
Clear
 

Expect pre-dawn delays on Route 22 Wednesday

By Randy Kraft, WFMZ.com Reporter, RKraft@wfmz.com
Published On: Jul 29 2013 08:17:48 PM CDT
Route 22 bridge construction logo
PHILLIPSBURG, N.J. -

Motorists on Route 22  at the Easton-Phillipsburg Toll Bridge will encounter traffic stoppages of up to 15 minutes in both directions beginning at 4 a.m. Wednesday.

Traffic will be stopped in both the eastbound and westbound directions, warn spokesmen for the Delaware River Joint Toll Bridge Commission.

Workers will be fixing a problem pothole area on the Broad Street Viaduct, the approach bridge between the toll plaza in Phillipsburg and the main bridge over the Delaware River.

A section of heaved pavement originally was confined to the eastbound side of the highway but has widened into the westbound lane as well.  Hot-mixed asphalt will be applied as a temporary repair.

Eventually that roadway will be completely replaced as part of the rehabilitation project being done on the bridge and its Route 22 approaches by the bridge commission.